Switch to Heat Pump Hot Water – Save on Bills, Use Your Solar Smarter

Switch to Heat Pump Hot Water – Save on Bills, Use Your Solar Smarter
1️⃣ Use your own electricity instead of gas
2️⃣ Cut hot water costs by up to 60–80%
3️⃣ Future-proof your home (all-electric living)
One upgrade. Long-term savings. Better lifestyle.
Why Customers Are Switching
Problem:
1️⃣ Gas bills are getting too expensive
2️⃣ Solar energy is being exported cheaply
3️⃣ Want to move towards fully electric home
Solution:
✅ Run hot water using solar during the day
✅ Reduce dependence on gas entirely
✅ Store energy as hot water (thermal storage)
What Size Heat Pump Do You Need?

If you often run out of hot water, choose a larger system. If you have solar and battery, a larger tank stores more energy.
WiFi Control
1️⃣ Built-in WiFi available on some models
2️⃣ Can integrate with timers or smart systems
3️⃣ Run during solar generation
4️⃣ Avoid peak electricity costs
Government Rebates
STC rebate is available for all households.
REPS Subsidy (South Australia – 2026 Update)
In 2026, REPS rebates are exclusively available to Priority Group households.
🔹 Pensioner Concession Card
🔹 Health Care Card
🔹 Energy Concession
🔹 Gold Repatriation Health Card (EDA)
🔹 TPI Gold Card / War Widows Gold Card
🔹 Rent ≤ $500 per week
🔹 Hardship program participation
🔹 SAFCA referral
📌 REPS is limited and subject to allocation
📌 Eligibility must be verified
📌 Generally one-time use
Our Brands
1️⃣ Reclaim Energy – premium Japanese technology
2️⃣ Rinnai – reliable and cost-effective
3️⃣ Haier – great value option
Why Choose Energy Loop
✅ Specialists in REPS & STC rebates
✅ Work directly with manufacturers
✅ Only install proven systems
✅ Custom system design
✅ Ongoing support
Get a Free Assessment Today
✅ Check rebate eligibility
✅ Recommend correct system size
✅ Estimate your savings
Register your interest
Free Registration
To express your interest, simply fill out the form. We'll be in touch in 2 business days. Installation priority will be based on the registration list, so act fast!
Response within 2 business days
Installation priority follows the registration list
